UIUC Ceramics Building Restroom Renovation

Renovation of existing toilet rooms to provide accessibility and updates; addition of new toilet rooms as shown, replacement of electrical switchgear, and the associated building work. Environmental abatement will be required per the drawings and specifications and will include the removal and disposal of: asbestos containing floor tile, asbestos containing pipe insulation, and lead-based paint.
  Spec Books (click to expand/collapse)
Bid Documents:
Up to [1] set(s) of Bid Documents per prequalified bidder of the divisions of work being bid may be obtained from the Professional Services Consultant by depositing a check made payable to the Professional Services Consultant in the amount of $ [240] OR non-cash plan deposit programs which are guaranteed by contractor associations are acceptable.
This is available for download to registered users. Log in now
Name Size
Project Manual Volume 1 4.6 MB
Project Manual Volume 2 5.7 MB
Project Manual Volume 3 4.8 MB