UIUC Ceramics Building Restroom Renovation
Renovation of existing toilet rooms to provide accessibility and updates; addition of new toilet rooms as shown, replacement of electrical switchgear, and the associated building work. Environmental abatement will be required per the drawings and specifications and will include the removal and disposal of: asbestos containing floor tile, asbestos containing pipe insulation, and lead-based paint.
Addendum 1
(click to expand/collapse)

There were 2 specification sections that are included in the project manual, but were not listed in the Table of Contents. They are:
26 13 00 Medium Voltage Switchgear
26 13 16 Medium Voltage Fused Switch Interrupter
We have issued Addendum No. 01 which updated the Table of Contents to list these 2 sections.
26 13 00 Medium Voltage Switchgear
26 13 16 Medium Voltage Fused Switch Interrupter
We have issued Addendum No. 01 which updated the Table of Contents to list these 2 sections.
Name | Size | ||
U18027 Addendum No. 1 | 118.2 KB | ||
_00_Project Manual TOC | 96.3 KB |
Addendum #2
(click to expand/collapse)

Name | Size | ||
11_Addendum No.2 Drawings_Combined | 4.2 MB | ||
11_U18027 Addendum No. 2 | 547.2 KB | ||
12_190819 Minutes with Attachments | 1.2 MB | ||
12_Pre-Bid Agenda - 2019.08.14 | 86.0 KB | ||
12_PreBid Clarification Emails_2019.08.21 | 1.6 MB | ||
12_U18027 MAFBE Pre-Bid Packet | 182.3 KB |
Addendum 3
(click to expand/collapse)

Addendum 3 posted 9-4-19
Name | Size | ||
07a_Addendum 3 Drawings Combined | 7.7 MB | ||
11_U18027 Addendum No. 3 & Bid Questions | 189.1 KB | ||
U18027_Transmittal 08_Addendum 3 BKlein | 75.8 KB | ||
U18027_Transmittal 08_Addendum 3 CGrant | 72.8 KB | ||
U18027_Transmittal 08_Addendum 3 Design&Constr | 72.4 KB | ||
U18027_Transmittal 08_Addendum 3 DMaier | 71.8 KB | ||
U18027_Transmittal 08_Addendum 3 MStilger | 74.0 KB | ||
U18027_Transmittal 08_Addendum 3 NRobards | 72.5 KB | ||
U18027_Transmittal 08_Addendum 3 QKim | 71.8 KB | ||
U18027_Transmittal 08_Addendum 3 VTutich | 71.6 KB |
Addendum 4
(click to expand/collapse)

The UIUC Ceramics Building project Addendum No. 4: Answers to Bid Questions. Please note that there are no drawings associated with this addendum. Posted 9-6-19
Name | Size | ||
11_U18027 Addendum No. 4 & Bid Questions | 127.1 KB |
Bid Tab Division 1
(click to expand/collapse)

Name | Size | ||
U18027 Div 1 Bid Tab | 49.9 KB |
Bid Tabs for Divisions 2,4,5
(click to expand/collapse)

Name | Size | ||
U18027 Bid Tab 09 10 19 | 155.9 KB |