#U18006 Education Building Elevator Upgrades & Restroom Renovations

The project shall include upgrades to both elevators, E-1 (north) and E-2 (south), including new cab finishes, doors, controls, etc.; reusing the existing platform. Elevators will be completed in sequence, to allow for a fully functioning elevator at all times. In addition to the elevator modernization, renovation of the existing women’s restrooms and a new ADA compliant single occupant restroom located on the first floor, will be completed. With the renovation of the women’s restrooms, priority will be given to the ground floor and first floor, followed by the second and third floors. Work will be phased to minimize the inconvenience to the occupants. Restroom renovations will include rework of plumbing risers, all new plumbing fixtures and accessories, new ceramic wall tile, and cleaning and repairing the existing terrazzo floor and base. New LED lighting and the upgrading of mechanical systems to be provided. A new janitor’s sink will also be provided on each floor.
  Addendum #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
07_U18016 Addendum No. 1 140.8 KB
102213 - Wire Mesh Partitions 43.4 KB
U18016_DWGS_ADD01 16.6 MB
U18016_PSK-01 169.2 KB
  Pre-Bid Meeting Minutes with Sign in Sheet (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
190610 Meeting Minutes_Pre-Bid Meeting 661.0 KB