#U18005 Noyes Laboratory of Chemistry – Limited First Floor Renovation

The Noyes Laboratory of Chemistry – Limited First Floor Renovation project includes new windows, upgraded finishes, including painting, flooring, cleaning/repairing existing terrazzo flooring, new ceilings, new lighting, new door hardware, fire suppression, interior signage and stairway finish upgrades to the east side of the building. Also included is a conversion of an existing unused we laboratory into a new general assignment lecture hall with audio-visual technology and furniture. A new standalone air-handler unit to serve the HVAC needs of the new lecture hall.

Status

Bidding Closed

Prebid Date1/3/19 10:00 am

Bid Date2/8/19 1:00 pm

Company & Contacts

Tilton, Kelly + Bell, LLC

Kim Sarchet   312-447-3100

Location

505 South Mathews Avenue

Bid Date:

Bids will be received up to the hour of 2:30 PM prevailing time, on 02/05/2019 for Contract Divisions:

02 & 03-Plumbing combined with Heating A/C Temp Control Work 04-Ventilation Work 05-Electrical Work & AV 06-Sprinkler Work

Bids will be received up to the hour of 2:30 PM prevailing time, on 02/07/2019 for Contract Divisions: 01-General Work

Mandatory Pre-Bid Conference:
January 3, 2019 – 10:00 AM
Noyes Laboratory of Chemistry – Chemistry Library – Conference Room 170
Urbana, Illinois 61801